Fatsa Peripheral Highway

Survey & Design

Kosekoy-Gebze HSR Line

Construction Supervision

Kartal-Kaynarca Metro Line

Construction Supervision

Sarikaya-Akdagmadeni Highway

Survey & Design

Morogoro-Makutupora Railway

Hydrological Study

5th Region Highway Network

Construction Supervision

Alanya-Gazipaşa Highway

Survey & Design

TOKI Package-15

Consultancy Services

Kemeralti Public Infrastructure

Survey & Design

5th Region Highway Network

 
Construction Supervision
 
 
Client: 5th Regional Directorate of Highways
 
Work Period: 17.11.2016 - ongoing
 
Services Provided:
Contract and claim management, budget-cost control, scheduling and reporting services, ensuring occupational health & safety measures, ensuring staff regularity and training of relevant personnel, ensuring the protection of environmental issues, quality control, construction supervision services, supervision of geodesy works, supervision of earthworks and soil survey studies, preparation of as-built drawings together with the Contractor and giving consultancy services during provisional acceptance period, preparation of final payment report and giving consultancy services during final acceptance period
 
Technical Details:
The project consists of engineering, technical consultancy and construction supervision services for the construction of 8 highway connections within boundries of the 5th Regional Directorate of Highways covering Mersin-Adana-Hatay-K.Maras Region. These 8 highway connections are in bituminous hot mixture pavement type and can be listed as follows: “Mersin-Adana State Highway”, “Narlı-Pazarcık-8.Bl.Hd. Highway”, “Ceyhan-Yumurtalık Highway”, “Antakya-Reyhanlı, Kırıkhan-Reyhanlı and Topboğazı-Kırıkhan State Highways”, “Adana-Kozan State Highway”, “Göksun-Elbistan State Highway”, “Adana Southern Peripheral Highway” and “Islahiye-Hassa-Kırıkhan State Highway”.