Fatsa Peripheral Highway

Survey & Design

Kosekoy-Gebze HSR Line

Construction Supervision

Kartal-Kaynarca Metro Line

Construction Supervision

Sarikaya-Akdagmadeni Highway

Survey & Design

Morogoro-Makutupora Railway

Hydrological Study

5th Region Highway Network

Construction Supervision

Alanya-Gazipaşa Highway

Survey & Design

TOKI Package-15

Consultancy Services

Kemeralti Public Infrastructure

Survey & Design

Sarikaya-Akdagmadeni Highway

 
Survey & Design
 
 
Client: General Directorate of Highways
 
Work Period: 08.08.2008 - ongoing
 
Services Provided:
- Geodesy services
- Highway design
- Design of engineering structures
- Feasibility and research studies
- Traffic design
- Project info file
- Preparation of final report
 
Technical Details:
53 km long route between Sarikaya-Akcakisla-Akdagmadeni consists of 18 interchanges. The project covers the following design disciplines: Geodesy works; Determination of check-points and approval of the Client, Assign of check-points and related measurings, calculations, Calculations for coordinate transformation and submittal of supervision, reports to the Client, Land survey and to form digital geodesic model. Highway Design; Design of geometrical components and preparation of the report, Hydraulic and hydra-geological surveys, Cross-section drawings, determination of retaining walls, cut-fill and bruckner calculations, Determination of intersections and connection ways, drawings of plan-profile and details, Drainage design and related drawings, Preparation of final report and quantity survey, Submittal of Final Design for the approval of the Client. Engineering structures; Preparation of preliminary and final design for bridges, flying-overs, underpasses, culverts, etc. Feasibility and Research Studies; Geological survey and report, Hydra-geological survey and report, Engineering geology survey and report, Geological-geotechnical research programme and applications, Geological-geotechnical survey and design report, Geotechnical design report, Superstructures survey and design report. Traffic Design; Traffic design report and quantity survey, submittal to the Client. Project Info File; Decision for the necessity of Environmental Impact Assessment. Final Report; Preparation of final report and submittal to the Client.