Fatsa Peripheral Highway

Survey & Design

Kosekoy-Gebze HSR Line

Construction Supervision

Kartal-Kaynarca Metro Line

Construction Supervision

Sarikaya-Akdagmadeni Highway

Survey & Design

Morogoro-Makutupora Railway

Hydrological Study

5th Region Highway Network

Construction Supervision

Alanya-Gazipaşa Highway

Survey & Design

TOKI Package-15

Consultancy Services

Kemeralti Public Infrastructure

Survey & Design

Fatsa Peripheral Highway

 
Survey & Design
 
 
Client: General Directorate of Highways
 
Work Period: 17.08.2017 - ongoing
 
Services Provided:
- Geodesy services
- Highway design
- Design of engineering structures
- Tunnel design
- Feasibility and research studies
- Traffic design
- Project info file
- Preparation of final report
 
Technical Details:
22 km long route consists of 5 interchanges, 5 tunnels (10623m) and 3 bridges. The project covers the following design disciplines: Geodesy works; Determination of check-points and approval of the Client, Assign of check-points and related measurings, calculations, Calculations for coordinate transformation and submittal of supervision reports to the Client, Land survey and to form digital geodesic model. Highway design; Design of geometrical components and preparation of the report, Hydraulic and hydra-geological surveys, Cross-section drawings, determination of retaining walls, cut-fill and bruckner calculations, Determination of intersections and connection ways, drawings of plan-profile and details, Drainage design and related drawings, Preparation of final report and quantity survey, Submittal of Final Design for the approval of the Client. Engineering Structures; Preparation of preliminary and final design for bridges, flying-overs, underpasses, culverts, etc. Tunnel Design; Preliminary design, Geometric design of the highway tunnel, Final design. Feasibility & Research studies; Geological survey and report, Hydra-geological survey and report, Engineering geology survey and report, Geological-geotechnical research programme and applications, Geological-geotechnical survey and design report, Geotechnical design report, Superstructures survey and design report. Traffic Design; Traffic design report and quantity survey, submittal to the Client. Project Info File; Decision for the necessity of Environmental Impact Assessment. Final Report; Preparation of final report and submittal to the Client.