Client: Istanbul Special Provincial Administration Project Coordination Unit
 
Work Period: 10.02.009 - 06.09.2015
 
Services Provided:
- Design preparation (structural, civil, architectural, mechanical, electrical, medical, landscape)
- Preparation of tender documents
- Tender evaluation / construction contract signing stage
- Services required for preparation to medical equipment installation
- Construction supervision services
- Services required for procurement of medical equipment
 
Technical Details:
The project covers the period including the design & construction of 330 beds capacity Umraniye Maternity & Pediatrics Hospital. The hospital has been designed in order to be constructed on the green area within the existing 250 beds capacity Public Hospital. The total construction area for the hospital is approx. 45000 m2. The hospital is formed of 2 main sections. The first section which is in rectangle form includes the followings; 2nd basement: shelter, parking garage, 1st basement: laboratories, morgue, sterilization unit, technical areas, Ground floor: hospital main entrance and relevant administrative units, emergency entrances and relevant units, radiology center, 1st floor: pediatric inpatient units, 2nd floor: pediatric inpatient units, 3rd floor: surgery rooms, intensive care units, bone marrow transplantation-haematology-oncology units, 4th floor: technical areas related with surgery rooms, conference hall, seminar halls and some administrative units. The second section which is in elliptic form includes the followings; 2nd basement: shelter, parking garage, 1st basement: kitchen, laundry, staff locker rooms, technical areas, Ground floor: pediatric and gynaecological outpatient clinics, 1st floor: obstetrics inpatient units, 2nd floor: obstetrics & gynaecological inpatient units, 3rd floor: delivery rooms, maternity ward, technical areas, 4th floor: cafeteria, coffee bar. Besides, 307 cars capacity 3 floors multi-storey car park has been designed beneath the pedestrian main axis. The interior and exterior of the hospital has been designed by using nonconventional and maintenance friendly construction materials. The interior functions of the hospital have been solved based on the Health Facilities Guide 2010 prepared by the Ministry of Health. Meanwhile the seismic, sheltering and fire safety regulations has been met during design. Estimated total duration of the consultancy services is 35 months. Within this project some parallel works (design & consultancy services) has been held as follows; Istanbul Kucukyali Nursery (17373 m2 indoor area with 3 floors), Istanbul Pendik Mehmet Oguz Outpatients Clinic (14839.70 m2 indoor area with 4 floors), Istanbul Koca Mustafa Pasa Social Rehabilitation Center forYoung Ladies (1185 m2 indoor area with 4 floors). The project is financed by IBRD under World Bank. The consultancy services are held by Optim (40%) + Prokon (40%) + Obermeyer (10%) + Faust (10%) JV.